Goodyear Arizona

Go To Search
Print Page
email page
employee login

Road Closure Updates

6 Stories
Posted on: May 28, 2013

Celebrate Life Way, West of Litchfield Rd

4/22/13 to 6/22/13 24hr setup
Installation of extraction well. Restrictions on westbound Celebrate Life Way bike lane and shoulder area, west of Litchfield Rd.

Posted on: May 22, 2013

Litchfield Rd and Lower Buckeye Rd

5/28/13 to 6/21/13, 24hr setup
Contractor will be grading and paving. Restrictions are: southbound and northbound Litchfield Rd thru lanes, north and south of Lower Buckeye Rd; northbound Litchfield Rd will be moved to... Read on...

Posted on: May 10, 2013

Sarival Ave from Elwood St to Durango St

5/11/13 thru 7/13/13 24 hr setup

Street Improvements:

Plan 1: On 5/14/13 thru 7/13/13, Restrictions: Southbound Sarival Ave curb lane and shoulder from Supai Drive to north of Victory St and left turn lane onto... Read on...

Posted on: May 31, 2013

Sarival Ave, South of Baden Ave

6/03/13 to 6/18/13 6am to 6pm
Crews will be working on a waterline tie-in on Sarival Ave. Restrictions will be on northbound Sarival Ave on the shoulder area south of Baden Ave.

Posted on: May 22, 2013

Various locations

5-28-13 to 7-22-13 8:30am to 4:00pm

Contractor will be trimming palm trees in medians and behind sidewalks in various locations throughout the city.

Reastrictions are:

Plan 1: 5-28-13 to 5-30-13, A moving... Read on...

Posted on: May 22, 2013

Wigwam and Litchfield

3-25-13 to 7-6-13, 24 hour setup
Crews will be installing ramps & retaining walls for the pedestrian underpass. Restrictions are: Westbound curb & inside through lanes on Wigwam Blvd at the intersection of Wigwam Blvd and... Read on...



City of Goodyear Logo
City of Goodyear • 190 N. Litchfield Road • Goodyear AZ 85338 • Phone 623-932-3910 • Toll-Free 1-800-872-1749