Goodyear Arizona

Print Page
email page
employee login


News Flash - All
 
News Flash - Council Quorum Postings
Arizona Town Hall Luncheon
Biltmore Resort
2400 E. Missouri
Phoenix, AZ 85016
Date: 09/18/08
Time: 11:00 a.m.
Fall Concert Series - Rondavous
Goodyear Community Park
3151 N. Litchfield Rd.
Goodyear, AZ 85338
Date: 09/19/08
Time: 6:30 p.m.
Fall Concert Series - Gypsy's Juke Rockers
Goodyear Community Park
3151 N. Litchfield Rd.
Goodyear, AZ 85338
Date: 09/26/08
Time: 6:30 p.m.
Goodyear Recreational Sports Complex Grand Opening
East of Estrella Pkwy., South of Yuma Rd
Goodyear, AZ 85338
Date: 09/27/08
Time: 6:00 p.m. - 9:00 p.m.

 
News Flash - Home
MESSAGE FROM CITY MANAGER
Shop Goodyear -- Everyone Gains
Attend Citizen Police Academy

 
News Flash - Road Closure Updates
Bullard & I-10
Bullard Avenue is scheduled to be closed under I-10 from Thursday September 11 at 9:00 PM to Friday September 12 at 4:30 AM.
Bullard Ave, between Yuma Rd and Van Buren St.
Location: Bullard Ave, between Yuma Rd and Van Buren.

The contractor will be closing Bullard, between Yuma Rd and Van Buren.

** UNPAVED ROAD

Duration: 7/23/08 to11/23/08. Traffic control will be set for 24 hours.

Description: The contractor will be improving Bullard.

Bullard, South of Yuma Rd
Location: Bullard, South of Yuma Rd

The contractor will closing Bullard Rd, South of Yuma Rd. The road will be limited to construction access only.

** Road will be closed on Bullard Rd at the Water Treatment Plant to the South.

Duration: 7/30/08-12/8/08. Traffic control will be setup for 24hrs
The contractor will be installing a private irrigation crossing.

Clubhouse Dr at Sarival
Location: Clubhouse Dr at Sarival

The contractor will restricting one lane of traffic on Sarival Ave, between Clubhouse Dr and Indian School Rd.
Traffic will be redirected into the opposite lane using flagging stations.

** All construction activities will be at the Pebble Creek Golf Corse.

Duration: 9/8/08-10/15/08. Traffic control will be set from 8:30AM to 3:30PM

Description: The contractor will be installing a private irrigation crossing.

Cotton Lane and Indian School Rd.
Location: Cotton Lane and Indian School Rd.

The contractor will be restricting the shoulder on Indian School, between Loop 303 and Cotton Lane. The contractor
will also be restricting the shoulder on Cotton Lane, 2600 ft. North of Indian School Rd.

Duration: 7/5/08-9/30/08
Traffic control will be setup for 24hrs

Description: Traffic control for onsite improvements.

Cotton Lane Closed S/O MC 85 at Bridge and S/O of Estrella Parkway at turn-a-bout
Location: Cotton Lane Closed S/O MC 85 at Bridge and S/O of Estrella Parkway at turn-a-bout.

Duration: 8/14/08-1/31/09 - 24hr. Set-Up

Description: Closure will be in place while Cotton Lane road construction continues.

Dysart & I-10
Dysart Road is scheduled to be closed under I-10 from Thursday September 18 at 9:00 PM to Friday September 19 at 4:30 AM.
Elliot Rd and Estrella Pkwy
Location: Elliot Rd and Estrella Pkwy

The contractor will be restricting the right curb lane traveling North and South on Estrella Pkwy at Elliot.
Traffic will be stopped for short durations using flagging stations at the intersection.

Duration: 9/4/08-10/10/08. Restrictions will be set from 8:30AM to 3:30PM

Description: The contractor will be drilling and blasting at the NW corner of Estrella & Elliot.

Elwood at Cotton Lane, and Elwood at Sarival
Location: Elwood at Cotton Lane, and Elwood at Sarival.

The contractor will have multiple restrictions at the same time:

1. The contractor will be restricting the Eastbound shoulder for 650' on Elwood, West of Cotton Lane.

2. The contractor will be restricting the Eastbound shoulder for 700' on Elwood, East of Sarival.

Duration: 8/19/08-9/30/08. Traffic control will be setup for 24hrs

Description: The contractor will be paving the Southbound shoulder.

Litchfield & I-10
Litchfield Road is scheduled to be closed under I-10 from Thursday September 23 at 9:00 PM to Friday September 24 at 4:30 AM.
Lower Buckeye Pkwy at 157th Ave.
Location: Lower Buckeye Pkwy at 157th Ave.

Contractor will have two restrictions at separate times at the following location:

1. The contractor will be restricting the Westbound right travel lane on Lower Buckeye Pkwy at 157th Ave.

2. The contractor will be restricting the Westbound left travel lane on Lower Buckeye Pkwy at 157th Ave.

** The sidewalk will be restricted during construction at all times.

Duration: 9/2/08-9/12/08. Traffic Control will be set during 8:30AM to 3:30PM.

Description: The contractor will be installing a 3" water line on Lower Buckeye Pkwy.

Lower Buckeye Parkway and Estrella Parkway
Location: Lower Buckeye Parkway and Estrella Parkway

1. The contractor will be restricting the northbound right travel lane on Estrella Parkway at Lower Buckeye Parkway.

Duration: 8/15/08-9/14/08 - This is a 24Hr. Set-Up

Description: The contractor will be constructing a turning lane.

Sarival, between Elwood and Commerce
Location: Sarival, between Elwood and Commerce.

The contractor will be restricting the Southbound shoulder on Sarival, starting North of Elwood to W. Commerce Dr.

Duration: 8/19/08-9/30/08. Traffic control will be setup for 24hrs

Description: The contractor will be paving the shoulder.

Van Buren, East of Litchfield Rd. (111 E. Van Buren St.)
Location: Van Buren, East of Litchfield Rd. (111 E. Van Buren St.)

The contractor will have two (3) restrictions at the same location at separate times:

1. The contractor will be restricting both Eastbound travel lanes on Van Buren at Litchfield Rd. All traffic will be redirected
into the left turn lane, through the intersection. Both left turn lanes onto Litchfield will be restricted.

2. The contractor will be restricting the West and Eastbound left travel lane on Van Buren at Litchfield, turn lanes
will be maintained onto Litchfield.

3. The contractor will be restricting both Westbound travel lanes on Van Buren, East of Litchfield. Traffic will be redirected
into the median and left turn lane.

* The sidewalk will be restricted on the South side of the road. Pedestrians will be redirected across the street at the nearest crosswalk.

Duration: 9/4/08-9/17/08 from 8:30AM to 3:30PM

Description: The contractor will be crossing Van Buren to tap and install a fire line underground.



City of Goodyear Logo
City of Goodyear • 190 N. Litchfield Road • Goodyear AZ 85338 • Phone 623.932.3910 • Toll-Free 1.800.872.1749